Hardware Supply Chain

Y

Y Combinator

Request for Startups

Elevator Pitch

A Shenzhen team can turn a design into a physical part within a day; US teams often wait weeks. YC wants startups that make US hardware iteration an order of magnitude faster.

Get involved

Full Description

YC is backing a growing number of hardware companies, including medical devices, home robots and space, but building hardware in the US is still far slower than in China. The real gap is iteration speed: in Shenzhen, dense supplier networks and close links between design and production can turn a drawing into a physical part within a day; in the US that often takes weeks. A few startups are building pieces (YC cites Hlabs and Prototyping.io), but the overall stack is missing.

The ask: startups that produce parts much faster, enable rapid iteration, and tightly integrate design, manufacturing and logistics.

Read the full request on YC →

Discussion

No comments yet. Be the first to share your thoughts.

More in World of Atoms

Hardware Supply Chain | Questd